  • Design of Road Over Bridge at Theur, Pune for Rajdeep Buildcon Pvt. Ltd. Ahmednagar
  • Design of Road Over Bridge at Hadapsar, at Pune for Atur India Pvt. Ltd. Pune.
  • Design of Three subways & Three Box Culvert for the approach Road to Talegaon MIDC, For krishnai Construction, Pune.
  • Design of Five Arch Bridges & Retaining Wall of Pune Solapur Four Lanning BOT Project For IRB, Mumbai.
  • Design of Two Minor Bridges For the Palus MIDC Road Project, Sangli.
  • Structural design of flyover at Magarpatta junction.
  • Structural Design of Major Bridge Across river Nira at Baramati. This bridge is a part of 4 Lanning Baramati- Shirwal Project.
  • Structural Design Of major Bridge across river Ghod.
  • Structural Design of Minor Bridge across Canal. This bridge is a part of 4 Lanning Baramati- Shirwal Project.
  • Structural Design of Major Bridge across Sarainala at Sangli.
  • Structural Design of Major Bridge at Rajapur.
  • Widening of Existing ROB near Alankar Theatre at Pune.
  • Structural Design of Major Bridge on RanjangaonWalki Road Across river Bhima near village RanjangaonSandas.
  • Structural Design of Flyover at Pune Satara Road at Dhankawadi, Pune.
  • Structural Design of 12 m wide bridge on Indrayani River in survey no. 134 at Dehu.
  • Structural Design of RUB at Khatarnakpullia at Jodhpur Rajasthan.
  • Structural Design of Major bridge across river Indrayani at Dehu (Work in progress).
  • Structural Design of RUB at Handewadi (Sasanenagar), Pune.
  • Structural Design of Major bridge across river Indrayani at Alandi (Work in progress).
  • Structural Design of Major Bridge at Dehu of Length of 150 m of 12 m wide for PWD Planning Dept.
  • Structural Design of Major Submersible Ghod River Bridge of length of 112 m for PWD Dept (Work In Progress)
  • Structural Design of Bridge of Length 120 m across river Urmodi for PWD Dept.
  • Construction of Major bridge on Ghataprabha River of length 60 m Near village Kurni Kolhapur.
  • Structural Design of Major Bridge of Length 95 m across river Mula for PWD Dept (Work in progress).
  • Structural Design of Major Bridge of Length 160 m across river Korda for PWD Dept (Work in progress).

PROOF CHECKING

  • Proof checking for Six Lane Major Bridge across River Indrayani at Talwade MIDC – Chakan Road, Pune Length of bridge was 240m, for the MIDC Chinchwad, Pune.
  • Proof checking for Major Bridge across River Mula near Sangamwadi, Pune Length was 250m. with a carriageway of 20.2m Normal of MSRDC.
  • Proof checking for Vehicular underpasses, Viaduct and Retaining Wall for the Warora ROB junction BOT project of MSRDC.
  • Proof checking of BOX Culvert of Mumbai- Pune Bye Pass Road.
  • Proof checking for Major/ Minor bridges, ROB Viaduct portion, Retaining Wall & Road development at Katol Bypass Highway BOT project of MSRDC.
  • Proof Checking for Major/ Minor bridges, culverts for 4/6 Lanning of the Pune-Solapur section of NH-9 Project of NHAI.
  • Proof Checking for construction of High level Bridge across River Godavari at Kilometre 166/0 of Vijaywada- Jagadalpur Road of NH- 22 ( New NH- 03) in the state of Andhra Pradesh.

BUILDING

  • Planning & RCC design of the Godown Building at Shiroli, Kolhapur for C.A. Nagdev.
  • Design & retrofitting work for the cantilever slab for Quality Control Laboratory, of BILT Graphics (I) LTD, Bhigwan.
  • Completed the survey work & Tower foundation design for more than 1000 sites in and around Pune for AIRTEL, Bharti Cellular Ltd, Indus Towers Ltd.
  • Completed the design of chemical factory building for the M/s Siddhivinayak Chemicals, Kurkumbh.
  • Completed the design of Mezzanine structural floor of Phase I for the Multinational company CAP GEMINE ERNST & YOUNG, Vikroli, Mumbai.
  • Design of the Mezzanine Structural Floor of Phase-II for the Multinational CAP Gemini ERNST & YUONG, Vikroli, Mumbai.
  • Design of bottling Plant for Sahara Amby Valley, for B.J. Samson Construction Co. Pune.
  • Design of Factory Shed pf Kushako Pneumatic at Pune.
  • Design of Sanskritik Sabhagriha at Daund, Pune.

LAUNCHINGS

  • Launching Scheme for the Kamshet ROB.
  • Launching Scheme for the Talegaon MIDC ROB.
  • Launching Scheme for the Savastar ROB.
  • Launching Scheme for the Dapodi ROB.
  • Launching Scheme for the Wardha ROB.
  • Launching Scheme of PSAE girder of 30 m span for ROB on Pune -Solapur highway for NHAI.
  • Launching Scheme for 5 ROB' on Mumbai-Nashik highway for NHAI.
  • Launching scheme using launching truss 100 m length across river Krishna for NHAI.
  • Launching scheme of PSC girder of 22m span for R>O>B> At Railway Km 24/10 of Goods Line to NEW Mangalore Port at Km 364-365 of Nh 66 (Formally NH-17)

STAGING

  • Design of temporary structure (staging & Shuttering ) for the bridges on Lasur - Aurangabad-Goti Road Package-12, for the Rajdeep Building Pvt. Ltd.
  • Design of temporary structure (staging & Shuttering ) for the ROB at Kedgaon & Phursungi for the Rajdeep Buildcon Pvt. Ltd.
  • Solid slab /VUP staging design for the project 4 Lanning of Pune-Solapur Section from Km 40 to Km 93.70 of NH-9
  • Design of shuttering schemes for PSC/RCC girder superstructure (30 m span) for 4/6 Lanning of the Pune-Solapur section project.
  • Design of staging scheme for Tunnel Traveller formwork.

TENDERING WORK / ESTIMATION

  • Pre- Tendering work for Grade Separator@ Palasia Junction, Indore (MP) for Simplex Concrete Piles (I) Ltd, Mumbai.
  • Tender working for infrastructure project of Satara-Kolhapur Road Package-I, for Kadam Construction.
  • Preparation of the tender proposal & estimation from conception for the Bridge Across River Mutha, near Sangamwadi, at Pune for MSRDC.
  • Preparation of the tender proposal & estimation from conception for the Bridge Across River Pawana, at Rawet, Pune for MSRDC.
  • Tender working for the Major Bridge across River Venna, Near Satara, For Atur Construction (India) Ltd. Pune
  • Tender working for flyover at Indore of length around 1 km. The total cost of project is 50 crores.
  • Tender working for flyover at Pune coating around 45 crores.
  • Pre& Post tendering work for Subway (45M Road) BRTS road in PCMC.
  • Pre & Post tendering work of 30M road in Dehu, PCMC.
  • Pre & Post tendering work of 30M road at Charholi, PCMC.
  • Pre & Post tendering work of 18M road at Dudalgaon, PCMC.
  • Pre & Post tendering work of 18M road at Kotwalwadi, PCMC.
  • Pre & Post tendering work of School Building at Dubalgaon, PCMC.
  • Pre tendering DPR work of Roads for PMGSY, Pune Region (250 Kms).
  • Pre tendering DPR work of Roads for PMGS,Konkan Region (300 Kms).
  • Pre tendering DPR work of Roads for PMGSY, Aurangabad Region (250 Kms).

Roads & Highways

  • Improvement to Kolhapur – sawant wadi road – feasibility study
    The assignment was for selecting most viable alignment for the five routes from Kolhapur to Sawantwadi. The total length of these five routes was 536.91 Km.
    • Kolhapur- Sawantwadi. (After Deduction of NH Length) - 95.60 Km
    • Kolhapur— Sawantwadi. (After Deduction of NH Length) - 109 Km.
    • Kolhapur — Sawantwadi. (After Deduction of NH Length) - 137.50 Km
    • Kolhapur — Sawantwadi. (After Deduction of NH Length) - 98.60 Km.
    • Kolhapur —Sawantwadi (After Deduction of NH Length) - 96.21 Km.

  • Feasibility Study & Detailed Project Report for NH66 (17) near Pen connecting to Khopoli terminating at NH48 (4)
    • Total Length of Road: 33.328 Km (Rigid Pavement)
    • 2 lane with Pavement Quality Concrete / Rigid pavement for the length of 30.628 Km.
    • 4 lane with Pavement Quality Concrete C/ Rigid pavement for the length of 2.70 Km.
    • Major Bridges 3 Nos. (2 Nos. x 100m + 1 Nos. 72m)
    • Minor Bridges 14 nos. (Total length = 190 m)
    • Vehicular Underpass - 2 nos.
    • Flexible pavement - 3.90 Km (Roads)
    • Micro surfacing on Pavement Quality Concrete (PQC) pavement is also proposed using latest technology.

  • Laxmi Mandir to DhayariPhata to Nanded City (Sinhagad Road).
    • Total length of Road is 8 Km
    • The road length is constructed in 'Bituminous' as well as 'Pavement Quality Concrete'.
    • The successful construction of 3 bridges, the combined length of which is approximately 110m.
    • Widening of existing road to Development Plan (DP) width of 36m by providing 6 lane carriageway with median.
    • Construction of 2.5m wide openable carriageway using 100 mm thick paver blocks on both sides with storm water drains below.
    • Cycle track 2.1m wide with 60mm thick paver blocks on both sides of the road.
    • Foot path 2.4m wide with 60mm thick paver blocks on both sides of the road.
    • Provision of utilities such as RCC duct for MSEB cables, HDPE pipes for telephone cables, CI line for water supply, sewer line as per requirement and PVC pipes for street light connections with all necessary chamber covers and cross ducts.
    • Traffic signals at two major junctions.
    • Conversion of existing High Tension cable over bead feeders into underground High Tension cables
    • Construction of 2.4m openable carriageway using 100 mm thick paver blocks on both sides with storm water drain below.

  • Link Road between Nagar & Paithan Road at Aurangabad.
    Project deals with development of 4 lane Link Road, one major bridge, four lane deck with parapet abutments, thin piers, returns, approach slab etc.
    • Total Length of the Project is 4.126km.
    • Carriageway Width: 7.5 X 2m
    • Length of Bridge: 70m
    • Span configuration of bridge: 10m span 7 nos
    • Median of 600 mm.

  • Supervision & Quality Control for Work under Pradhan Mantri Gram Sadak Yojana Phase VI, VII, IX and Asian Development Bank Ratlam.
    The project involved quality control & supervision of the entire execution of all Cross Drainage (CD) works in the alignments, small bridges, box culverts including quality tests of materials & finished pavement, submitting of all reports (RFI, DPR, MPR) & contractors bill checking, co-ordination with contractor & client.
    • Total Length of Road: 140 Km.

  • Hadapsar to Saswad Road
    • The project involved the construction of 30 m wide, 1.2Km long six lane road.
    • Length of Road: 1200 m.
    • Width of Road: 30 m.
    • Width of footpath: 4.5m one side.
    • 6 Lane Pavement Quality Concrete Road.
    • 15m wide concrete bridge over canal with an adjacent 3m wide steel footbridge.
    • All underground utility services with central median.

  • Lalbahaddur Shastri Road.
    • This is a 24 m wide, 1.2 Km long road.
    • The project involved redevelopment of Pune City's main connecting link for North-South directional traffic which has commercial units on both sides which makes it a very important road in the infrastructure of Pune city.
    • Developments proposed were to utilise full Right of Way (ROW) with crust design for projected traffic, provision of storm water RCC duct, junction improvement, utility services, medians, kerbs, etc.

  • Lalbahaddur Shastri Road.
    • This is a 24 m wide, 1.2 Km long road.
    • The project involved redevelopment of Pune City's main connecting link for North-South directional traffic which has commercial units on both sides which makes it a very important road in the infrastructure of Pune city.
    • Developments proposed were to utilise full Right of Way (ROW) with crust design for projected traffic, provision of storm water RCC duct, junction improvement, utility services, medians, kerbs, etc.

  • Hotel Amarpreet to Beed Bypass Road
    Improvement of existing road 1.9 Km long, 16m wide Bituminous Road.
    • Length of Road 1.99 Km.
    • Width of Road: 16 m
    • Width of footpath: 1.50 m
    • Two span of 7m each minor bridge width 19 m with 1.7m wide footpath
    • Approach length is 30.95 m towards Amarpreet Hotel & 23m toward Beed Bypass

  • Road from Jalgaon T Point to Harsool T Point
    • Project consist of four lane 4.96 km long road,
    • 19.10 m wide Bituminous Concrete road, 1.50m wide footpath.

  • Mundhwa Road
    • The Project consisted of construction of a 3.3 km long road.
    • 24 m wide four Lane B.T. road., Footpath Width: 3m both side.

  • Bhairoba Pumping Station to Magarpatta City.
    • The project consisted of construction of 1.6 Km long.
    • 18 m wide four lane concrete Pavement Quality Concrete road, width of footpath 1.5m (each side).

  • Road connecting Integrated School Complex to NH17.
    • Total Length of Road: 480m
    • Total Width: 17m (two lane road).
    • Total Width: 17m (two lane road).
    • Carriageway:14m Footpath Stadium compound wall side 1m. and School complex side 2m.

  • Road connecting Integrated School Complex to NH17.
    • Total Length of Road: 480m
    • Total Width: 17m (two lane road).
    • Total Width: 17m (two lane road).
    • Carriageway:14m Footpath Stadium compound wall side 1m. and School complex side 2m.

  • Road connecting NH4A to Miraculous Cross Church.
    • Total Length of road 700m.
    • Total width of road 7 m.
    • Structure:25mm asphalt concrete, 50mm thick DBM, 50mm thick BM with Crash Barrier.
    • Pipe Culvert: Width 6m, Length 8m, pipes used were 1200mm dia and 600mm dia.

  • Construction & Redevelopment of D.P. Road 24 M Wide ( making existing 2 Lanning Road to 4 Lanning Road ) from Triveni Nagar( Talwade) To DehuAlandi Road KM – 0/0 To 8/00. (Client – PCMC. Pune )

  • Construction and Re Development Of Road Work In "A" Ward In PCMC Limit. ( making existing 2 Lanning Road to 4 Lanning Road )
    Total Length – 18.50 KM.(Client – PCMC. Pune)

  • Construction Of Ultra Thin White Topping Roads In Dahanukar Colony.( Milling, Profile Correction, DBM, UT, WT and Paving Blocks, Cross Drainage Works)
    Total Length – 7.50 KM.(Client – Pune Municipal corporation)

  • Construction of UT WT Road in Sahakar Nagar and Bhusari Colony in PMC Limit. Total Length – 1.50 KM.
    (Client – Pune Municipal corporation)

  • Construction of Nalla Basin work and SWD Drainage system in Baner Basin Pune including cross Drainage work ( JNNURM Project )
    • Total Length Nalla Channelization – 17.50 KM .
    • Total Length of SWD Line – 15.75 KM.
    • Total Slab Culverts and CD Works – 35 Nos.
      (Client – Pune Municipal corporation)

  • Development of Dehu Alandi Road, From CH 0/00 To 15/ 050 Km .( making existing 2 Lanning Road to 6 Lanning Road of 30 M Width as per DP )
    • Total length 15.50 Km.
    • Minor Bridge 1.0 Nos ( 40M span )
    • Slab Culvert – 2.0 Nos ( 5& 6 M span )
    • Pipe Culvert – 3 Nos .

We express pride in successful completion of projects with various Government, Semi Government agencies and Private Sector organizations detailed hereunder.

Sr. No.
Name of work
Project Execution Agency
Project Year
Project Description
1
Andhra Pradesh State Highway APSH 7 & 8 Project (World Bank assisted)
Gayatri –IJM JV, Hyderabad, INDIA
2004-2005
Forensic analysis of pavement structure in India
2
Improvement & resurfacing of Mumbai Pune National Highway between Dapodi&Nigadi
Pimpri Chinchwad Municipal Corporation
2006
Rehabilitation of 10 Km Mumbai Pune Highway stretch under PCMC limits (Cost Rs. 14 Cr)
3
Maintenance & rehabilitation of Roads in A,B C & D Wards of PCMC as per Pavement Management System
Pimpri Chinchwad Municipal Corporation, Pimpri.
2006-2007
Maintenance and rehabilitation of Urban Roads in PCMC limits (Cost Rs. 30 Cr)
4
Development of DP Roads in A, B C & D Wards of PCMC as per recommendations of Pavement Management System
Pimpri Chinchwad Municipal Corporation, Pimpri.
2007-2009
Complete widening and development of major sub arterial Roads in PCMC limits as per Pavement Management System (Cost Rs. 150 Cr)
5
Maintenance & rehabilitation of Roads in various wards of Pune Municipal Corporation Pavement Management System
Pune Municipal Corporation
2007-2008
Maintenance and rehabilitation of Urban Roads in PMC limits (Cost Rs. 55 Cr)
6
Improvement and resurfacing of Roads in A, B C & D Wards & MIDC of PCMC as per Pavement Management System
Pimpri Chinchwad Municipal Corporation, Pimpri.
2007-2008
Improvement, resurfacing of Roads in PCMC limits (Cost Rs. 60 Cr)
7
Development & widening, resurfacing of Pashan – Sus Road as per DP provisions for Pune Municipal Corporation
Pune Municipal Corporation
2008
Development of major sub arterial Road (8 Km) in PMC limit (Cost Rs. 10 Cr)
8
Development & widening, resurfacing of NDA Road as per DP provisions for Pune Municipal Corporation
Pune Municipal Corporation
2009
Development of major sub arterial Road in PMC limit (3.5 Km Cost Rs. 10 Cr)
9
Development of MundhwaByepass Road
Pune Municipal Corporation
2009- ongoing
Development of major arterial Road in PMC limit (Cost Rs. 35 Cr)
10
Third Party Inspection of Road, Building and SWD works in PMC Zonal Offices
Pune Municipal Corporation
2008-2009
Road Works, Building works and Storm Water drainage work of Zonal Offices in PMC (Cost Rs. 70 Cr)
11
Amritsar Wagah Section of NH -1 under NHAI
National Highway Authority of India (for Innovative Technologies)
2007
Pavement design for new carriageway rehabilitation and overlay of existing pavement – 4 Laning National Highway project.
12
Development and institution of a Pavement Management System for the Road network in the Municipal Corporation jurisdiction
Pimpri Chinchwad Municipal Corporation, Pimpri.
2006-ongoing
Ongoing project on overall maintenance management and budget allocation for the 380 Km Road network with the Municipal Corporation of Pimpri Chinchwad, India
13
Development and institution of a Pavement Management System for the Road network in the Municipal Corporation jurisdiction
Pune Municipal Corporation, Pimpri.
2007-2009
Ongoing project on overall maintenance management and budget allocation for the 500 Km road network with the Municipal Corporation of Pune City, India
14
SH 7 – ShirwalLonandPhaltan Baramati Project under PWD Maharashtra
Public Works Department- Maharashtra State for Innovative Technologies
2009-2010
Pavement design for new carriageway rehabilitation and overlay of existing pavement – 4 Laning State Highway project
15
Development of new link and creek bridge near Mumbai City
Private entrepreneur
2008- ongoing
Development of a new link road for connection of suburbs near Mumbai City along with a Creek bridge
16
Storm Water Drainage Improvement for BanerBalewadi Basin of Pune under JNNURM scheme
Pune Municipal Corporation
2010- ongoing
Complete Project Management Consultancy for SWD improvement works(Cost Rs. 50 Cr)
17
Storm Water Drainage Improvement for VadgaonBudruk Basin of Pune under JNNURM scheme
Pune Municipal Corporation
2010- ongoing
Complete Project Management Consultancy for SWD improvement works (Cost Rs. 36 Cr)
18
Rehabilitation of Urban Roads with UTWT and TWT technology in PMC area
Pune Municipal Corporation
2009- ongoing
Rehabilitation of urban roads using innovative UTWT technology (15 Km Cost Rs.9 Cr)
19
IRDP Project for SHIRDI City
Maharashtra State Road Development Corporation
2010- ongoing
Complete Project Management Consultancy for IRDP Project(Cost Rs. 12.5 Cr)